How Should Passive Thermal Insulation Windows Be Installed?

2025-12-08

Passive thermal insulation windows are a very common type of window in modern architecture, offering excellent thermal insulation, waterproofing, and sound insulation. Therefore, they are widely used in residential and commercial buildings. In this article, Etaifeng will introduce the installation methods of passive thermal insulation windows, hoping to be helpful to you.


The following aspects should be emphasized during the installation of passive thermal insulation windows:

  • 1. Window frame material selection: Aluminum alloy can be chosen as the window frame material, offering good strength and durability.

  • 2. Sealing performance: The window frame and glass of passive thermal insulation windows use high-quality sealing materials, providing strong thermal and sound insulation.

  • 3. Window opening methods: Various opening methods are available, including casement, sliding, top-hung, and parallel sliding, to meet various working conditions.

  • 4. Convenient operation: Passive thermal insulation windows use a transmission mechanism, making opening and closing easy and convenient.


Process principles:

1. Connection with actual engineering: It is necessary to comprehensively evaluate the building design and window usage requirements to determine the window model, opening method, size, and other parameters.

2. Technical measures:

- Window installation base treatment: The base treatment methods vary depending on the region and building type, and should be handled flexibly according to the actual situation.

- Selection of sealing materials: Choose appropriate sealing materials based on the specific conditions of the building.

- Window fixing method: Choose a suitable installation method to ensure that the window is installed securely and stably.

Passive Thermal Insulation Windows

Specific installation procedures are as follows:

1、Window Measurement: Measure the wall opening based on the customer’s design requirements to determine the correct size of the Thermal Insulation Passive Window.

2、Material Preparation: Prepare the necessary window frame, glass, and other components.

3、Window Base Treatment: Choose an appropriate base treatment method according to the actual situation.

4、Window Frame Installation: Fix the window frame to the wall and confirm the stability of installation (this step is crucial).

5、Sealing Process: Apply sealing materials between the window frame and wall to ensure airtightness.

6、Glass Installation: Install the glass into the frame and ensure flatness and proper sealing.

7、Window Adjustment: After installation, check the opening and closing performance of the Thermal Insulation Passive Window, ensuring smooth operation.

8、Finishing Work: Clean the construction area and carry out final aesthetic finishing.

 

Construction Personnel:

Choose an experienced installation team and pay attention to personnel coordination, task distribution, and workflow management during the construction of the Thermal Insulation Passive Window.

 

Quality Inspection:

1、Pre-construction Quality Check: Inspect all materials to ensure they meet the requirements for installing the Thermal Insulation Passive Window.

2、Quality Control During Construction: Conduct quality inspections during each installation stage to ensure construction quality meets standards.

 

If you are considering purchasing a Thermal Insulation Passive Window but have not found a suitable supplier, feel free to contact us. With 29 years of window manufacturing experience, we can provide you with the most suitable solution.


Get the latest price? We will reply as soon as possible (within 12 hours)